CRP- 402B - Slabs/Interior-Exterior Footings
- Recent Professors
- Not yet assigned
- Recent Semesters
- No scheduled sections on record
- Class Size
- Not published
- Credits
- 1
- Transfers To
- Not transferable
- Description
- Description: Techniques and procedures used in the layout and setting of footing forms according to prints and shop drawings. Introduction of slab construction for casting tilt up panels will be discussed. Acceptable elevation tolerances, proper concrete placement, and slab leveling will be stressed. 20.00 hours lecture and 20.00 hours laboratory. (Letter grade or Pass/No Pass option)
