CRP- 402B - Slabs/Interior-Exterior Footings

    Recent Professors
    Not yet assigned
    Recent Semesters
    No scheduled sections on record
    Class Size
    Not published
    Credits
    1
    Transfers To
    Not transferable
    Description
    Description: Techniques and procedures used in the layout and setting of footing forms according to prints and shop drawings. Introduction of slab construction for casting tilt up panels will be discussed. Acceptable elevation tolerances, proper concrete placement, and slab leveling will be stressed. 20.00 hours lecture and 20.00 hours laboratory. (Letter grade or Pass/No Pass option)