Transfers ToNot transferableDescriptionPrerequisite: CONS 20 and CONS 21 or CONS 50A and CONS 50B. Advisory: CONS 22. (Formerly CONS 53) (A, CSU) ~Students are introduced to the requirements and techniques of properly finishing a structure per the uniform building code. Hands-on construction of a building or dwelling project, including window and door installation, stucco lathing, siding installation, drywall hanging and finishing, cabinet and hardware installation, finish carpentry, interior and exterior painting. (Starts Spring 2027)Usually HeldMon Tue Wed Thu 1:30pm–2:20pm, Mon Tue Wed Thu 2:30pm–5:35pm