STMFT 219 - Advanced Plan Reading for the Piping Trades
- Recent Professors
- Not yet assigned
- Recent Semesters
- No scheduled sections on record
- Class Size
- Not published
- Difficulty
- 6.4Demandingout of 10
- Credits
- 1.5
- Transfers To
- Not transferable
- Description
- This advanced course covers the interpretation of drawings and sketches associated with piping installation. Students will convert Piping and Instrumentation Diagrams (P&ID) and orthographic drawings to isometric drawings for material take-offs, fabrication, and field installation. <br /> <br />
